B Type Motor (For DRD Pump)
lnstalled on the equipment fuel tank, Vertical installation, the oil height can not exceed the installation surface2. There is a relief valve to prevent the lubrication pump set from overloading.

1.lnstalled on the equipment fuel tank, Vertical installation, the oil height can not exceed the installation surface.                         2. 2.There is a relief valve to prevent the lubrication pump set from overloading.

3. The oil absorption height can be selected according to actual needs, the standard is 165mm

4. The output pipe diameter standard is 6 (M10X1). lf required,8 (M 12x1.25) Please specify.

5.Lubrication viscosity: 32-2500CST

6.C No unloading valve, only for resistive or open lubrication systems.

7.F H with unloading valve for quantitative centralized lubrication system8. lf you need order pump continuously, add L for example B250FL.


屏幕快照 2023-11-02 下午7.39.38.png


leave a message
contact
mobile
Email
content
提交
0.065845s